The expected out turn of cement concrete 1 : 2 : 4 per mason per day is_________________?
As per Indian Standard Specifications, the peak discharge for domestic purposes per capita per minute, is taken________________?
The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as_______________?
The cross -section of a road partly in banking and partly in cutting is shown in the given figure. The area of the shaded portion is__________________?
For the construction of buildings, the subheads of the estimate are________________?
Cost of fittings and their fixing is specified for the following sanitary fittings________________?
The reduced levels of points, 30 metres apart along the longitudinal section of a road portion between chainages 5 and 9 are shown in the given figure. If there is a uniform up-gradient of the road 120 in 1, the chainage of the point with no filling or cutting is__________________?
The item of the brick structure measured in sq.m, is___________________?
According to ISI method of measurement, the order of the sequence is_________________?
The most reliable estimate is_________________?