The expected out turn of 12 mm plastering with cement mortar is_______________?
The total length of a cranked bar through a distance D. at 45° in case of a beam of effective length L, is_________________?
The concrete work for the following part of the building of specified thickness is measured in square metres_______________?
A portion of an embankment having a uniform up-gradient 1 in 500 is circular with radius 1000 m of the centre line. It subtends 180° at the centre. If the height of the bank is 1 m at the lower end, and side slopes 2:1, the earth work involved ?
The minimum width of a septic tank is taken__________________?
If B is the width of formation, d is the height of the embankment, side slope S : 1, for a highway with no transverse slope, the area of cross-section is___________________?
period in a septic tank is assumed___________________?
Pick up the incorrect statement regarding a master trap from the following ?
The diameter of a domestic sewer pipe laid at gradient 1 in 100 is recommended___________________?
The correct Prismoidal formula for volume is________________?