While estimating a reinforced cement structure, the omitted cover of concrete is assumed_______________?
The plinth area of a building not includes_________________?
The main factor to be considered while preparing a detailed estimate, is________________?
The rate of an item of work depends on_________________?
As per IS : 1172-1963, water required per head per day for average domestic purposes, is_______________?
If four fires break out in a city of population 40 lakhs and if each hydrant has three streams and duration of each fire is four hours, the total quantity of water required, is______________________?
Aeration of water is done to remove______________?
The area of the cross-section of a road fully in banking shown in the given figure, is________________?
The following item of earth work is not measured separately ?
Pick up the correct statement regarding the centre line method of estimating a building?