The rate of payment is made for 100 cu m (per % cu m) in case of__________________?
Brick walls are measured in sq. m if the thickness of the wall is_________________?
If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by_______________?
A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is__________________?
In the mid-section formula__________________?
The cross -sections for a highway is taken at_________________?
According to Indian Standards Institute, the actual size of modular bricks is_______________?
Pick up the excavation where measurements are made in square metres for payment ?
In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and_________________?
The area is measured correct to the nearest___________________?