While preparing a detailed estimate__________________?
The expected out turn of 2.5 cm cement concrete floor per mansion per day__________________?
Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds_________________?
The measurement is not made in square metres in case of________________?
The cost of the earthwork in excavation for the surface drain of cross-section shown in the given figure for a total length of 5 metres @ Rs. 450% cum, is_______________?
The trap which is provided to disconnect the house drain from the street sewer is called_________________?
The ‘centre line method’ is specially adopted for estimating_________________?
The inspection pit or chamber is a manhole provided in a base drainage system________________?
In case of laying gullies, siphons, intercepting traps, the cost includes_______________?
Carpet area does not include the area of_________________?