While preparing a detailed estimate__________________?

  • (A)  Dimension should be measured correct to 0.01 m
  • (B)  Area should be measured correct to 0.01 sqm
  • (C)  Volume should be measured correct to 0.01 cum
  • (D)  All the above
Submitted By :Ali Uppal


Submitted By :Ali Uppal


Submitted By :Ali Uppal


The measurement is not made in square metres in case of________________?

  • (A)  D.P.C. (Damp proof course)
  • (B)  Form works
  • (C)  Concrete Jeffries
  • (D)  R.
Submitted By :Ali Uppal


Submitted By :Ali Uppal


The trap which is provided to disconnect the house drain from the street sewer is called_________________?

  • (A)  Master trap
  • (B)  Intercepting trap
  • (C)  Interception manhole
  • (D)  All the above
Submitted By :Ali Uppal


The ‘centre line method’ is specially adopted for estimating_________________?

  • (A)  Circular buildings
  • (B)  Hexagonal buildings
  • (C)  Octagonal buildings
  • (D)  All the above
Submitted By :Ali Uppal


The inspection pit or chamber is a manhole provided in a base drainage system________________?

  • (A)  At every change of direction
  • (B)  At every change of gradient
  • (C)  At every 30 m intervals
  • (D)  All the above
Submitted By :Ali Uppal


In case of laying gullies, siphons, intercepting traps, the cost includes_______________?

  • (A)  Setting and laying
  • (B)  Bed concreting
  • (C)  Connection to drains
  • (D)  All of these
Submitted By :Ali Uppal


Carpet area does not include the area of_________________?

  • (A)  The walls along with doors and other openings
  • (B)  Bath room and lavatory
  • (C)  Kitchen and pantry
  • (D)  All the above
Submitted By :Ali Uppal