In time-cost optimization of a project, crashing is done____________?
The time with which direct cost does not reduce with the increase in time is known as_________________?
The direct cost of a project with respect to normal time is________________?
Economic saving of time results by crashing_________________?
Slack time refers to_______________?
The constraints in case of resource smoothening operation would be_______________?
Crash project duration is obtained by summing the________________?
Which of the following earth moving machines has the shortest cycle time?
For a given size of bucket, the ideal output of a dragline will be least in_______________?
Assertion A: For a given depth of cut, the output of a power shovel can be increased by decreasing the angle of swing Reason R: If the angle of swing is decreased, the cycle time will be decreased_______________?