Preliminary project report for a road project must contain___________________?

  • (A)  the detailed estimated cost based on detailed design
  • (B)  the several alternatives of the project that have been considered
  • (C)  the soil survey, traffic survey, concept design and approximate cost
  • (D)  the contract documents for inviting tenders
Submitted By :Ali Uppal


Sensitivity analysis is a study of__________________?

  • (A)  comparison of profit and loss
  • (B)  comparison of assets and liabilities
  • (C)  change in output due to change in input
  • (D)  economics of cost and benefits of the project
Submitted By :Ali Uppal


Submitted By :Ali Uppal


Submitted By :Ali Uppal


Submitted By :Ali Uppal


Submitted By :Ali Uppal


Submitted By :Ali Uppal


Submitted By :Ali Uppal


Submitted By :Ali Uppal


At a work site, statistical quality control of concrete means________________?

  • (A)  measurement of risks to eliminate failures
  • (B)  applying the theory’ of probability to sample testing or inspection
  • (C)  reduction in wastage of inspection costs
  • (D)  reduction in costs for the removal of defects
Submitted By :Ali Uppal