Referring of given figure, pick up the correct statement from the following?
The expected out turn of brick work in cement mortar in foundation and plinth per mason per day, is ________________?
The height of the sink of wash basin above floor level is kept____________________?
For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cement required, is___________________?
For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is_______________?
The expected out turn of half brick partition wall per mason per day is___________________?
The slope of the outlet of ‘P trap’ below the horizontal is kept________________?
Pick up the correct statement in case of water supply ?
When the axis of load lies in the plane of rivet group, then the most heavily loaded rivet will be the one which________________?
Bending compressive and tensile stresses respectively are calculated based on_________________?