The order of booking dimensions is________________?
Berms are provided in canals if these are__________________?
The weight of an item is measured correct to nearest_________________?
The floor area includes the area of the balcony up to_________________?
Size, capacity and materials need be specified for__________________?
88 is 1400 kg/cm2 and bond stress is 6 kg/cm2, the If tensile stress of a steel rod of diameter required bond length of the rod is____________________?
The volume is measured correct to the nearest__________________?
The item of steel work which is measured in sq.m, is_________________?
The brick work is measured in sq metre, in case of_________________?
The expected out turn for earth work in excavation in ordinary soil per workman per day is_______________?