For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is_______________?

Civil Engineering Mcqs

For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is_______________?

(A)  0.90 m3

(B)  0.94 m3

(C)  0.98 m3

(D)  1.00 m3