The expected out turn for earth work in excavation in ordinary soil per workman per day is_______________?

Civil Engineering Mcqs

The expected out turn for earth work in excavation in ordinary soil per workman per day is_______________?

(A)  1.00 cum

(B)  2.00 cum

(C)  3.00 cum

(D)  4.00 cum