- (A) the detailed estimated cost based on detailed design
- (B) the several alternatives of the project that have been considered
- (C) the soil survey, traffic survey, concept design and approximate cost
- (D) the contract documents for inviting tenders
Civil Engineering Mcqs
- (A) comparison of profit and loss
- (B) comparison of assets and liabilities
- (C) change in output due to change in input
- (D) economics of cost and benefits of the project
- (A) Ice
- (B) Concrete
- (C) Loose sand
- (D) Earth
- (A) Concrete
- (B) Loose sand
- (C) Asphalt
- (D) Firm earth
- (A) 2 kg/tonne
- (B) 6 kg/tonne
- (C) 9 kg/tonne
- (D) 20 kg/tonne
- (A) 20 kg/tonne
- (B) 30 kg/tonne
- (C) 40 kg/tonne
- (D) 50 kg/tonne
- (A) 50%
- (B) less than 50%
- (C) more than 50%
- (D) 100%
- (A) Rs.1740
- (B) Rs.3480
- (C) Rs.5220
- (D) Rs.6960
- (A) 2.3% and 84.1%
- (B) 97.7% and 84.1%
- (C) 97.7 % and 15.9%
- (D) 15.9% and 97.7%
- (A) measurement of risks to eliminate failures
- (B) applying the theory’ of probability to sample testing or inspection
- (C) reduction in wastage of inspection costs
- (D) reduction in costs for the removal of defects

