- (A) 3.7 years
- (B) 4.23 years
- (C) 5 years
- (D) 7.87 years
Civil Engineering Mcqs
- (A) 4 days
- (B) 6 days
- (C) 10 days
- (D) 16 days
- (A) 50%
- (B) 84.1%
- (C) 99.9%
- (D) 100%
- (A) Rs. 31050
- (B) Rs. 34500
- (C) Rs. 37950
- (D) Rs. 50000
- (A) 10000 kg
- (B) 12500 kg
- (C) 22500 kg
- (D) 5000 kg
- (A) 30 kg
- (B) 300 kg
- (C) 900 kg
- (D) 1000 kg
- (A) longest duration
- (B) highest cost slope
- (C) least cost slope
- (D) shortest duration
- (A) 80 and 90
- (B) 90 and 80
- (C) 85 and 75
- (D) 75 and 83
- (A) controlling the total quantity at each batch
- (B) weighing accurately, the quantity of each material for a job before mixing
- (C) controlling the quantity of each material into each batch
- (D) adjusting the water to be added in each batch according to the moisture content of the materials being mixed in the batch
- (A) Hoe
- (B) Shovel
- (C) Dragline
- (D) None of the above