- (A) Rs. 4,75,000/-
- (B) Rs. 5,75,000/-
- (C) Rs. 6,50,000/-
- (D) Rs. 8,50,000/-
Civil Engineering Mcqs
- (A) equal to X
- (B) more than X
- (C) less than X
- (D) any of the above
- (A) Moist loam
- (B) Good common earth
- (C) We|l blasted rock
- (D) Wet sticky clay
- (A) Drag line
- (B) Hoe
- (C) Clam shell
- (D) Dipper shovel
- (A) reduce by 200 kg
- (B) increase by 200 kg
- (C) increase by 250 kg
- (D) reduce by 250 kg
- (A) total float and free float
- (B) total float and independent float
- (C) free float and independent float
- (D) none of the above
- (A) change of critical path
- (B) decrease of project completion time
- (C) increase of project completion time
- (D) all of the above
- (A) the fund for rebuilding a structure when its economic life is over
- (B) raised to meet maintenance costs
- (C) the total sum to be paid to the municipal authorities by the tenants
- (D) a part of the money kept in reserve for providing additional structures and structural modifications
- (A) increase in rates of only important materials
- (B) variation in cost in materials element, labour element and petrol-oil-lubricant element
- (C) variation in total cost of the project on an ad hoc basis
- (D) rate of inflation
- (A) crash time
- (B) normal time
- (C) optimistic time
- (D) between normal time and crash time