The process of incorporating changes and rescheduling or replanning is called_______________?
The reduction in project time normally results in_______________?
The time by which a particular activity can be delayed without affecting the preceding and succeeding activities is known as_______________?
A father notes that when his teenage daughter uses the telephone, she takes not less than 6 minutes for a call and som? times as much as an hour. Fifteen minutes call are more frequent than calls of any other duration. If these phone calls were an activity in PERT project, then phone calls expected duration will be_______________?
Critical path_____________?
Whenever an activity has zero total float, then_______________?
If the optimistic time, most likely time and pessimistic time for activity A are 4, 6 and 8 respectively and for activity B are 5, 5.5 and 9 respectively, then______________?
Latest start of an activity is always________________?
Which of the following does not represent an activity?
If the excavation of earth is done manually then it costs Rs. 10 per cum. A machine can excavate at a fixed cost of Rs. 4000 plus a variable cost of Rs. 2 per cum. The quantity of earth for which the cost of excavation by machine will be equal to the cost of manual excavation is_________________?