Get App on

Play Store

Civil Engineering Mcqs

While estimating a reinforced cement structure, the omitted cover of concrete is assumed_______________?

 (A)  At the end of reinforcing bar, not less than 25 mm or twice the diameter of the bar

 (B)  In thin slabs, 12 mm minimum or diameter of the bar whichever is more

 (C)  For reinforcing longitudinal bar in a beam 25 mm minimum or diameter of the largest bar which is more

 (D)  All the above

Submitted By :Ali Uppal


Share this... Share on Facebook
Facebook
Tweet about this on Twitter
Twitter
Share on LinkedIn
Linkedin
Share on Whatsapp
Whatsapp

  • IF YOU THINK THAT ABOVE POSTED MCQ IS WRONG.

  • PLEASE COMMENT BELOW WITH CORRECT ANSWER AND ITS DETAIL EXPLANATION.

  • Related Mcqs


    Leave a Reply

    Your email address will not be published. Required fields are marked *