- (A) ahead of schedule
- (B) beyond schedule
- (C) as per schedule
- (D) on critical path
- (E) none of the above
Mechanical Engineering Mcqs
- (A) a straight line
- (B) a number enclosed in a circle or a square
- (C) a straight line with circles at the ends
- (D) a dotted line
- (E) an arrow
- (A) latest start time of succeeding event -earliest finish time of preceding event activity time
- (B) latest start time of the event – earliest start time of the event
- (C) latest finish time of event – earliest finish time of the event
- (D) anyone of the above
- (E) none of the above
- (A) consumes time, but no resources
- (B) consumes resources but no time
- (C) consumes neither time nor resources
- (D) is a dangling event
- (E) consumes both resources and time
- (A) increases continuously
- (B) decreases continuously
- (C) remains constant
- (D) may increase or decrease depending on various factors
- (E) unpredictable
- (A) consequential effects of lack in one activity on omer
- (B) consequential effects of lack in one activity on the finish date
- (C) free time available for an activity can’t be predicted
- (D) effective monitoring/controlling can’t be done
- (E) all of the above
- (A) once through project
- (B) maintenance jobs
- (C) research and development
- (D) all non-technical jobs
- (E) all of the above
- (A) synthesising in concepts
- (B) is built of activities oriented program-mes
- (C) is, based on one time eytimate
- (D) is used for repetitive works
- (E) all of the above
- (A) free float = total float
- (B) independent float = total float
- (C) independent float > free float
- (D) free float > total float
- (E) independent float < free float
- (A) event flow scheduling technique
- (B) critical ratio scheduling
- (C) slotting technique for scheduling
- (D) short interval scheduling
- (E) none of the above