- (A) Length, breadth, height
- (B) Breadth, length, height
- (C) Height, breadth, length
- (D) None of these
Civil Engineering Mcqs
- (A) Fully in excavation
- (B) Partly in excavation and partly in embankment
- (C) Fully in embankment
- (D) All the above
- (A) 0.25 kg
- (B) 0.50 kg
- (C) 0.75 kg
- (D) 1.00 kg
- (A) 100 %
- (B) 75 %
- (C) 50 %
- (D) 25 %
- (A) Bib-cocks
- (B) Stop-cocks
- (C) Ball valves
- (D) All the above
- (A) 30 D
- (B) 39 D
- (C) 50 D
- (D) 59 D
- (A) 0.01 cum
- (B) 0.02 cum
- (C) 0.03 cum
- (D) 0.04 cum
- (A) Collapsible gates
- (B) Rolling shutters
- (C) Ventilators and glazing
- (D) All the above
- (A) Honey comb brick work
- (B) Brick flat soling
- (C) Half brick walls or the partition
- (D) All the above
- (A) 1.00 cum
- (B) 2.00 cum
- (C) 3.00 cum
- (D) 4.00 cum

