- (A) 2.5 sq m
- (B) 4.0 sq m
- (C) 6.0 sq m
- (D) 8.0 sq m
Civil Engineering Mcqs
- (A) L + 0.42 d
- (B) L + (2 × 0.42 d)
- (C) L – (0.42 d)
- (D) L – (2 × 0.4 d)
- (A) Root slabs
- (B) Floors
- (C) Wall panels
- (D) All the above
- (A) 26,000 m3
- (B) 26,500 m3
- (C) 27,000 m3
- (D) 27,500 m3
- (A) 70 cm
- (B) 75 cm
- (C) 80 cm
- (D) 90 cm
- (A) B + d + Sd
- (B) Bd + Sd2
- (C) B × d – Sd1/2
- (D) ½ (Bd + Sd2)
- (A) 20 minutes
- (B) 25 minutes
- (C) 30 minutes
- (D) 40 minutes
- (A) It is provided in between the lower end of the house drain and the street sewer
- (B) It is provided a cleaning eye at the top of the trap
- (C) The mica flap valve which opens inwards only, is fitted at the top of the inlet pipe
- (D) The water seal is less than that of ordinary traps
- (A) 100 mm
- (B) 150 mm
- (C) 200 mm
- (D) 175 mm
- (A) D [first area + last area + Even area + 2 odd areas]
- (B) D/3 [first area + last area + 4 Even area + 2 odd areas]
- (C) D/3 [first area + last area + 2 Even area + 4 odd areas]
- (D) D/6 [first area + odd areas]

