- (A) Dimension should be measured correct to 0.01 m
- (B) Area should be measured correct to 0.01 sqm
- (C) Volume should be measured correct to 0.01 cum
- (D) All the above
Civil Engineering Mcqs
- (A) 2.5 sqm
- (B) 5.0 sqm
- (C) 7.5 sqm
- (D) 10 sqm
- (A) 2.0 %
- (B) 2.5 %
- (C) 4.0 %
- (D) 5.0 %
- (A) D.P.C. (Damp proof course)
- (B) Form works
- (C) Concrete Jeffries
- (D) R.
- (A) Rs. 400
- (B) Rs. 425
- (C) Rs. 450
- (D) Rs. 500
- (A) Master trap
- (B) Intercepting trap
- (C) Interception manhole
- (D) All the above
- (A) Circular buildings
- (B) Hexagonal buildings
- (C) Octagonal buildings
- (D) All the above
- (A) At every change of direction
- (B) At every change of gradient
- (C) At every 30 m intervals
- (D) All the above
- (A) Setting and laying
- (B) Bed concreting
- (C) Connection to drains
- (D) All of these
- (A) The walls along with doors and other openings
- (B) Bath room and lavatory
- (C) Kitchen and pantry
- (D) All the above

