- (A) 1.5 m 3
- (B) 2.5 m3
- (C) 3.5 m3
- (D) 5.0 m3
Civil Engineering Mcqs
- (A) 1.80 litres for 5 to 10 users
- (B) 1.20 litres for 15 users
- (C) 1.35 for 20 users
- (D) All the above
- (A) Excavation
- (B) Surface dressing
- (C) Cutting
- (D) Surface excavation
- (A) b – rd)²/(r – s)
- (B) b – rd)²/(r + s)
- (C) ½ × (b + rd)²/(r – s)
- (D) b – rd)²/(s – r)
- (A) Earthwork, Concrete work, Brick work
- (B) Brickwork, Stone work, Roofing
- (C) Brickwork Flooring, Wood work, Steel work
- (D) All the above
- (A) Water closets
- (B) Flushing pipes
- (C) Lavatory basins
- (D) All the above
- (A) (6 + 15) chains
- (B) (6 + 12) chains
- (C) (6 + 18) chains
- (D) None of these
- (A) Reinforced brick work
- (B) Broken glass coping
- (C) Brick edging
- (D) Brick work in arches
- (A) Length, breadth, height
- (B) Breadth, length, height
- (C) Height, length, breadth
- (D) None of these
- (A) Detailed estimate
- (B) Preliminary estimate
- (C) Plinth area estimate
- (D) Cube rate estimate