Bottom most layer of pavement is known as_____________?

  • (A)  wearing course
  • (B)  base course
  • (C)  sub-base course
  • (D)  subgrade
Submitted By :Ali Uppal


For rapid curing cutbacks, the oil used is______________?

  • (A)  gasoline
  • (B)  kerosene oil
  • (C)  light diesel
  • (D)  heavy diesel
Submitted By :Ali Uppal


RC-2, MC-2 and SC-2 correspond to_______________?

  • (A)  same viscosity
  • (B)  viscosity in increasing order from RC-2 to SC-2
  • (C)  viscosity in decreasing order from RC-2 to SC-2
  • (D)  none of the above
Submitted By :Ali Uppal


Submitted By :Ali Uppal


Submitted By :Ali Uppal


For the construction of water bound macadam roads, the correct sequence of operations after spreading coarse aggregates is________________?

  • (A)  dry rolling, wet rolling, application of screening and application of filler
  • (B)  dry rolling, application of filler, wet rolling and application of screening
  • (C)  dry rolling, application of screening, wet rolling and application of filler
  • (D)  dry rolling, application of screening, application of filler and wet rolling
Submitted By :Ali Uppal


The binder normally used in flexible pavement construction is________________?

  • (A)  cement
  • (B)  lime
  • (C)  bitumen
  • (D)  none of the above
Submitted By :Ali Uppal


Submitted By :Ali Uppal


Maximum daily traffic capacity of bituminous pavements is______________?

  • (A)  500 tonnes per day
  • (B)  1000 tonnes per day
  • (C)  1500 tonnes per day
  • (D)  2000 tonnes per day