In highway construction, rolling starts from________________?
The camber of shoulders in water bound macadam roads is________________?
Most suitable material for highway embankments is______________?
The most suitable equipment for compacting clayey soils is a_______________?
When the bituminous surfacing is done on already existing black top road or over existing cement concrete road, the type of treatment to be given is________________?
The allowable length of an offset depends upon the______________?
Which of the following methods of offsets involves less measurement on the ground?
The correction for sag is_________________?
The camber for hill roads in case of bituminous surfacing is adopted as________________?
In highway construction on super elevated curves, the rolling shall proceed from_________________?