- (A) comparison of profit and loss
- (B) comparison of assets and liabilities
- (C) change in output due to change in input
- (D) economics of cost and benefits of the project
Exam preparation MCQs with answers
Practice Pakistan's most useful MCQs for competitive exams
Prepare for NTS, PPSC, FPSC and subject-wise tests with fresh multiple choice questions, clear options and quick answer reveal.
Latest MCQs
- (A) Ice
- (B) Concrete
- (C) Loose sand
- (D) Earth
- (A) Concrete
- (B) Loose sand
- (C) Asphalt
- (D) Firm earth
- (A) 2 kg/tonne
- (B) 6 kg/tonne
- (C) 9 kg/tonne
- (D) 20 kg/tonne
- (A) 20 kg/tonne
- (B) 30 kg/tonne
- (C) 40 kg/tonne
- (D) 50 kg/tonne
- (A) 50%
- (B) less than 50%
- (C) more than 50%
- (D) 100%
- (A) Rs.1740
- (B) Rs.3480
- (C) Rs.5220
- (D) Rs.6960
- (A) 2.3% and 84.1%
- (B) 97.7% and 84.1%
- (C) 97.7 % and 15.9%
- (D) 15.9% and 97.7%
- (A) measurement of risks to eliminate failures
- (B) applying the theory’ of probability to sample testing or inspection
- (C) reduction in wastage of inspection costs
- (D) reduction in costs for the removal of defects
- (A) on all the activities
- (B) on all the activities lying on the critical path
- (C) only on activities lying on the orginal critical path and having flatter cost slopes
- (D) on original critical activities and those that become critical at any stage of crashing in the order of ascending cost slope