- (A) total duration of project is reduced
- (B) total duration of project is increased
- (C) uniform demand of resources is achieved
- (D) cost of project is controlled
- (A) on commencement of work at site for payment of loan taken by him
- (B) for the purchase of construction materials
- (C) for the payment of advances to labour and other staff
- (D) for all activities required to start the work at site on finalization of the contract document
- (A) should invest in neither of the two projects
- (B) could invest in either of the two projects
- (C) should invest in project A
- (D) should invest in project B
- (A) Rs. 8,800/-
- (B) Rs. 7,600/-
- (C) Rs. 6,400/-
- (D) Rs. 5,000/-
- (A) 8 days
- (B) 9 days
- (C) 10 days
- (D) 15 days
- (A) trimming and finishing
- (B) shaping and trimming
- (C) finishing and shaping
- (D) finishing, shaping and trimming
- (A) Smooth-wheeled rollers
- (B) Vibratory rollers
- (C) Sheep foot rollers
- (D) Tampers
- (A) Kneading
- (B) Pressing
- (C) Tamping
- (D) Vibration
- (A) the detailed estimated cost based on detailed design
- (B) the several alternatives of the project that have been considered
- (C) the soil survey, traffic survey, concept design and approximate cost
- (D) the contract documents for inviting tenders