- (A) for checking the relative values of various layouts
- (B) when a group of workers are working at a place
- (C) where processes require the operator to be moved from one place to another
- (D) all of the above
- (E) none of the above
Mechanical Engineering Mcqs
- (A) Dry work Plan
- (B) Halsey Premium Plan
- (C) Taylor Plan
- (D) Bedaux Plan
- (E) Rowan Plan
- (A) value analysis
- (B) operation research
- (C) linear programming
- (D) model analysis
- (E) none of the above
- (A) Halsey Premium Plan
- (B) Bedaux Plan
- (C) Lincoln Plan
- (D) Rowan Plan
- (E) Taylor Plan
- (A) 2 HA
- (B) 1.33 HA
- (C) 1.5 HA
- (D) 1.15 HA
- (E) 2.5 HA
- (A) 50%
- (B) 661%
- (C) 75%
- (D) 80%
- (E) 90%
- (A) Rowan Plan
- (B) Bedaux Plan
- (C) Taylor Differential Piece rate system
- (D) Halsey Premium plan
- (E) Day work plan
- (A) improving present method and finding standard time
- (B) motivation of workers
- (C) improving production capability
- (D) improving production planning and control
- (E) all of the above
- (A) early finish
- (B) early start
- (C) late start
- (D) late finish
- (E) none of the above
- (A) bar chart method
- (B) milestone chart
- (C) critical path method (CPM)
- (D) programme evaluation and review technique (PERT)
- (E) none of the above