- (A) second
- (B) minute
- (C) hour
- (D) day
- (E) none of the above
Mechanical Engineering Mcqs
- (A) material handling
- (B) proper utilisation of manpower
- (C) production schedule
- (D) efficient working of machine
- (E) all of the above
- (A) batch production
- (B) continuous type of product
- (C) effective utilisation of machines
- (D) all of the above
- (E) none of the above
- (A) an idea of the flow of materials at various stages
- (B) a compact estimate of the handling which must be done between various work sections
- (C) the information for changes required in rearranging material handling equipment
- (D) an approximate estimate of the handling which must be done at a particular station
- (E) solution to handling techniques to achieve most optimum^ results
- (A) overall simplification, safety of integration
- (B) economy in space
- (C) maximum travel time in plant
- (D) to provide conveniently located shops
- (E) to avoid any bottlenecks
- (A) product layout
- (B) functional layout
- (C) automatic material handling equipment
- (D) specialisation of operation
- (E) minimum travel time plan and com¬pact layout
- (A) top level executives have to do excessive work
- (B) structure is rigid
- (C) communication delays occur
- (D) all of the above
- (E) none of the above
- (A) line organisation
- (B) line and staff organisation
- (C) functional organisation
- (D) effective organisation
- (E) none of the above
- (A) line organisation
- (B) line and staff organisation
- (C) functional organisation
- (D) effective organisation
- (E) none of the above
- (A) operation
- (B) inspection
- (C) transport
- (D) delay/temporary storage
- (E) none of the above

