- (A) sides and proceed to centre
- (B) centre and proceed to sides
- (C) one side and proceed to other side
- (D) any of the above
Civil Engineering Mcqs
- (A) equal to the cross slope of pavement
- (B) less than the cross slope of pavement
- (C) greater than the cross slope of pavement
- (D) zero
- (A) granular soil
- (B) organic soil
- (C) silts
- (D) clays
- (A) smooth wheeled roller
- (B) pneumatic tyred roller
- (C) sheep foot roller
- (D) vibrator
- (A) seal coat
- (B) tack coat
- (C) prime coat
- (D) spray of emulsion
- (A) degree of accuracy required
- (B) method of setting out the perpendiculars and nature of ground
- (C) scale of plotting
- (D) all of the above
- (A) method of perpendicular offsets
- (B) method of oblique offsets
- (C) method of ties
- (D) all involve equal measurement on the ground
- (A) always additive
- (B) always subtractive
- (C) always zero
- (D) sometimes additive and sometimes subtractive
- (A) 2%
- (B) 2.5%
- (C) 3%
- (D) 4%
- (A) sides towards the centre
- (B) centre towards the sides
- (C) lower edge towards the upper edge
- (D) upper edge towards the lower edge