Civil Engineering Mcqs

Select the correct statement________________?
  • (A)  Quantity of binder required for tack coat is less than that required for prime coat
  • (B)  Prime coat treatment is given for plugging the voids in water bound macadam during bituminous road construction
  • (C)  Seal coat is the final coat over certain previous bituminous pavements
  • (D)  A bitumen primer is a high viscosity cutback