Get App on

Play Store

Civil Engineering Mcqs

Submitted By :Ali Uppal


A hyetograph is a graphical representation of___________________?

  • (A)  rainfall intensity and time
  • (B)  rainfall depth and time
  • (C)  discharge and time
  • (D)  cumulative rainfall and time
Submitted By :Ali Uppal


A runoff river plant_________________?

  • (A)  is a medium head scheme
  • (B)  generates power during peak hours only
  • (C)  is suitable only on a perennial river
  • (D)  has no pondage at all
Submitted By :Ali Uppal


A runoff river plant is____________?

  • (A)  a low head scheme
  • (B)  a medium head scheme
  • (C)  a high head scheme
  • (D)  none of the above
Submitted By :Ali Uppal


A river bend characterized by silting_______________?

  • (A)  scouring on concave side
  • (B)  silting on convex side
  • (C)  scouring on convex side and on concave side
  • (D)  scouring on concave side and silting on convex side
Submitted By :Ali Uppal


Submitted By :Ali Uppal


Which of the following methods is used to estimate flood discharge based on high water marks left over in the past ?

  • (A)  slope-area method
  • (B)  area-velocity method
  • (C)  moving boat method
  • (D)  ultra-sonic method
Submitted By :Ali Uppal


The stream which does not have any base flow contribution is called________________?

  • (A)  perennial stream
  • (B)  intermittent stream
  • (C)  ephemeral stream
  • (D)  none of the above
Submitted By :Ali Uppal


If the demand line drawn from a ridge in a flow mass curve does not intersect the curve again, it indicates that______________?

  • (A)  demand cannot be met by inflow
  • (B)  reservoir was not full at the beginning
  • (C)  both (A) and (B)
  • (D)  none of the above
Submitted By :Ali Uppal


Submitted By :Ali Uppal