Get App on

Play Store

Civil Engineering Mcqs

Setting out the alignments of sewers may start from__________________?

  • (A)  City
  • (B)  Out-fall
  • (C)  Tail end
  • (D)  Any point
Submitted By :Ali Uppal


The most widely used pump for lifting sewage is_________________?

  • (A)  Centrifugal pump
  • (B)  Reciprocating pump
  • (C)  Pneumatic ejector
  • (D)  Air pressure pump
Submitted By :Ali Uppal


Lead caulked joints are used for laying____________________?

  • (A)  Stone ware pipes
  • (B)  Earthenware pipes
  • (C)  C.I. pipes
  • (D)  G.I. pipes
Submitted By :Ali Uppal


Submitted By :Ali Uppal


The pH value of fresh sewage is usually ______________________?

  • (A)  Equal to 7
  • (B)  More than 7
  • (C)  Less than 7
  • (D)  Equal to zero
Submitted By :Ali Uppal


Submitted By :Ali Uppal


The sewer pipes__________________?

  • (A)  Carry sewage as gravity conduits
  • (B)  Are designed for generating self-cleansing velocities at different discharge
  • (C)  Should resist the wear and tear caused due to abrasion
  • (D)  All the above
Submitted By :Ali Uppal


Submitted By :Ali Uppal


The temperature affects the________________?

  • (A)  Biological activity of bacteria in sewage
  • (B)  Solubility of gases in sewage
  • (C)  Viscosity of sewage
  • (D)  All the above
Submitted By :Ali Uppal


Submitted By :Ali Uppal