- (A) Project manager
- (B) Project team
- (C) SQA group
- (D) All of the mentioned
Software Engineering Mcqs
- (A) testing
- (B) help line support
- (C) warranty work
- (D) complaint resolution
- (A) Hardware
- (B) Software
- (C) Programmers
- (D) None of the mentioned
- (A) Quality Control
- (B) Quality of conformance
- (C) Quality Assurance
- (D) None of the mentioned
- (A) rework
- (B) repair
- (C) failure mode analysis
- (D) none of the mentioned
- (A) Hazard avoidance
- (B) Damage limitation
- (C) Hazard detection
- (D) Hazard detection and removal
- (A) Human error or mistake
- (B) System fault
- (C) System error
- (D) System failure
- (A) Risk
- (B) Hazard probability
- (C) Accident
- (D) Damage
- (A) Regression Testing
- (B) System Testing
- (C) Integration Testing
- (D) Unit Testing
- (A) Coverage
- (B) Minimization
- (C) Safe
- (D) Maximization

