- (A) The leadership practices in Commitment to Perform
- (B) The organizational structure (groups) practices in Ability to Perform
- (C) The policy practices in Commitment to Perform
- (D) The planning practices in Commitment to Perform
Software Engineering Mcqs
- (A) Design
- (B) Repeatable
- (C) Managed
- (D) Optimizing
- (A) CMM
- (B) ISO 9001
- (C) ISO 9000-3
- (D) None of the mentioned
- (A) ISO 9001
- (B) ISO 9000-4
- (C) CMM
- (D) All of the mentioned
- (A) evaluations to be performed
- (B) amount of technical work
- (C) audits and reviews to be performed
- (D) documents to be produced by the SQA group
- (A) Introducing new practices, methods or processes
- (B) Introducing new team members to existing project
- (C) Introducing or removing deliverable
- (D) Introducing new roles or responsibilities
- (A) Software Product Engineering
- (B) Software Quality Assurance
- (C) Software Subcontract Management
- (D) Software Quality Management
- (A) continuous process improvement
- (B) the need to record information
- (C) the need to accept quality system
- (D) none of the mentioned
- (A) collection
- (B) maintenance
- (C) verification
- (D) dis-positioning
- (A) Capability Management Module
- (B) Conservative Maturity Model
- (C) Capability Maturity Module
- (D) Capability Maturity Model

