- (A) 1 in 12
- (B) 1 m 15
- (C) 1 in 20
- (D) 1 in 30
Civil Engineering Mcqs
- (A) zero
- (B) 64m
- (C) 80m
- (D) 60m
- (A) average speed
- (B) spot speed
- (C) space-mean speed
- (D) time-mean speed
- (A) an ascending gradient meets with another ascending gradient
- (B) an ascending gradient meets with a descending gradient
- (C) a descending gradient meets with another descending gradient
- (D) an ascending gradient meets with a level surface
- (A) longitudinal gradient
- (B) two times the longitudinal gradient
- (C) three times the longitudinal gradient
- (D) half the longitudinal gradient
- (A) 0.1 %
- (B) 1 %
- (C) 10%
- (D) no compensation
- (A) simple parabola
- (B) cubic parabola
- (C) spiral
- (D) lemniscate
- (A) 3 %
- (B) 4%
- (C) 5 %
- (D) 6%
- (A) increases
- (B) decreases
- (C) first decreases and then increases after reaching a minimum value at optimum speed
- (D) first increases and then decreases after reaching a maximum value at optimum speed
- (A) 1.0
- (B) 2.0
- (C) 0.5
- (D) 10

