- (A) overtaking sight distance
- (B) two times the overtaking sight distance
- (C) three times the overtaking sight distance
- (D) five times the overtaking sight distance
Civil Engineering Mcqs
- (A) less
- (B) more
- (C) same
- (D) dependent on the speed
- (A) rectangular or block road pattern
- (B) radial or star and block road pattern
- (C) radial or star and circular road pattern
- (D) radial or star and grid road pattern
- (A) reconnaissance, map study, preliminary survey and detailed survey
- (B) map study, preliminary survey, reconnaissance and detailed survey
- (C) map study, reconnaissance, preliminary survey and detailed survey
- (D) preliminary survey, map study, reconnaissance and detailed survey
- (A) 1 in 30
- (B) 1 in 36
- (C) 1 in 48
- (D) 1 in 60
- (A) slipping
- (B) skidding
- (C) turning
- (D) revolving
- (A) rougher than the traffic lanes
- (B) smoother than the traffic lanes
- (C) of same colour as that of the pavement
- (D) of very low load bearing capacity
- (A) stopping distance
- (B) two times the stopping distance
- (C) half the stopping distance
- (D) three times the stopping distance
- (A) effective drainage
- (B) counteracting the centrifugal force
- (C) having proper sight distance
- (D) none of the above
- (A) rough
- (B) dry
- (C) smooth and dry
- (D) smooth and wet

