- (A) trowel
- (B) square
- (C) bolster
- (D) scutch
Civil Engineering Mcqs
- (A) segmental arch
- (B) pointed arch
- (C) relieving arch
- (D) flat arch
- (A) intrados
- (B) rise
- (C) spandril
- (D) extrados
- (A) 0.5 m
- (B) 0.7 m
- (C) 0.9 m
- (D) 1.2 m
- (A) compacting the soil
- (B) draining the soil
- (C) increasing the depth of foundation
- (D) grouting
- (A) friction pile
- (B) sheet pile
- (C) batter pile
- (D) anchor pile
- (A) perpendicular distance between intra-dos and extrados
- (B) vertical distance between springing line and intrados
- (C) perpendicular distance between springing line and extrados
- (D) none of the above
- (A) cork flooring
- (B) glass flooring
- (C) wooden flooring
- (D) linoleum flooring
- (A) 25 mm
- (B) 25 to 40 mm
- (C) 40 to 65 mm
- (D) 65 to 100 mm
- (A) 25 mm
- (B) 40 mm
- (C) 65 mm
- (D) 100 mm