- (A) iron
- (B) carbon
- (C) manganese
- (D) sulphur
Civil Engineering Mcqs
- (A) headers
- (B) stretchers
- (C) brick bats
- (D) queen closer
- (A) 90 mm
- (B) 180 mm
- (C) 190 mm
- (D) 280 mm
- (A) brick laid with its length parallel to the face or direction of wall
- (B) brick laid with its breadth parallel to the face or direction of wall
- (C) brick having the same length and depth as the other bricks but half the breadth
- (D) brick with half the width at one end and full width at the other
- (A) along the direction of bedding planes
- (B) at 45° to the direction of bedding planes
- (C) at 60° to the direction of bedding planes
- (D) perpendicular to the direction of bedding planes
- (A) less than 0.25
- (B) between 0.25 and 0.7
- (C) between 0.7 and 1.5
- (D) greater than 1.5
- (A) less than 1
- (B) equal to 1
- (C) greater than 1
- (D) less than 1 in beams but greater than 1 in channels
- (A) Both A and R are true and, R is the correct explanation of A
- (B) Both A and R are true but R is not the correct explanation of A
- (C) A is true but R is false
- (D) A is false but R is true
- (A) ultimate stress
- (B) yield stress
- (C) proof stress
- (D) none of the above
- (A) wood work
- (B) iron work
- (C) both wood work and iron work
- (D) none of the above