- (A) Manoeuvring lane + 2 x Bank clearance lane
- (B) 2 x Manoeuvring lane + 2 x Bank clearance lane
- (C) 2 x Manoeuvring lane + 2 x Bank clearance lane + ship clearance lane
- (D) Manoeuvring lane + 2 x Bank clearance lane + ship clearance lane
Civil Engineering Mcqs
- (A) mean range
- (B) maximum range
- (C) maximum rise
- (D) mean rise
- (A) 1.2 H to 1.25 H above the datum
- (B) 1.2 H to 1.25 H above the low water level
- (C) 1.2 H to 1.25 H above the high water level
- (D) 1.2 H to 1.25 H above the mean sea level
- (A) one – third highest waves
- (B) one – fourth highest waves
- (C) one – fifth highest waves
- (D) one – tenth highest waves
- (A) Surf
- (B) Clapotis
- (C) Fetch
- (D) Swell
- (A) vertical sea wall
- (B) sea wall with batter
- (C) stepped sea wall
- (D) sea wall with concave face
- (A) marine railways, dry docks, floating docks, wet docks
- (B) dry docks, wet docks, floating docks, lift docks
- (C) wet docks, floating docks, lift docks, marine railways
- (D) wet docks, lift docks, marine railways, dry docks
- (A) 0.64 m
- (B) 0.96 m
- (C) 1.28 m
- (D) 1.5 m
- (A) 5 cm
- (B) 7.5 cm
- (C) 10 cm
- (D) 15 cm
- (A) 1.OH and 1.OH
- (B) 1.5Handl.5H
- (C) 2.0Handl.5H
- (D) 2.0H and 2.0H

