- (A) when the dock is empty
- (B) when the dock is empty with the ship of maximum tonnage
- (C) when the dock is full of water
- (D) when the dock is dry and is under construction
Civil Engineering Mcqs
- (A) 90° with the face of the dock
- (B) 45° with the face of the dock
- (C) 30° with the face of the dock
- (D) 10° with the face of the dock
- (A) Dry dock
- (B) Wet dock
- (C) Floating dock
- (D) Refuge dock
- (A) 5/8
- (B) 3/8
- (C) 3/16
- (D) 5/16
- (A) groynes
- (B) sea walls
- (C) revetments
- (D) moles
- (A) sea walls, bulk heads and groynes
- (B) sea walls, bulk heads and revetments
- (C) sea walls, revetments and groynes
- (D) bulk heads, revetments and groynes
- (A) bollard
- (B) buoys
- (C) cables
- (D) anchors
- (A) two points
- (B) four points
- (C) six points
- (D) eight points
- (A) 2.5 m
- (B) 4 m
- (C) 5 m
- (D) 7 m
- (A) 1.3412
- (B) 1.5612
- (C) 1.7412
- (D) 1.9412

