- (A) distance between the stops is more
- (B) maximum speed reached is high
- (C) acceleration and retardation rates are low
- (D) all of the above
Electrical Engineering Mcqs
- (A) Corrosion problems in the under-ground pipe work
- (B) Short time power failure interrupts traffic for hours
- (C) High capital outlay in fixed installations beside route limitation
- (D) Interference with communication lines
- (A) Main line service
- (B) Urban service
- (C) Sub-urban service
- (D) Urban and sub-urban service
- (A) 3 m
- (B) 6 m
- (C) 10 m
- (D) 15 m
- (A) Work against the resistance to motion
- (B) Work against gravity while moving up the gradient
- (C) Acceleration
- (D) All of the above
- (A) easy speed control
- (B) high starting tractive effort
- (C) equipment capable of with standing large temporary loads
- (D) all of the above
- (A) Diesel shunters
- (B) Steam locomotives
- (C) Electric locomotives
- (D) Diesel locomotives
- (A) main-line service
- (B) urban service
- (C) sub-urban service
- (D) all of the above
- (A) neutral wire
- (B) rails
- (C) cables
- (D) common earthing
- (A) Less current drain on the heavy load torque
- (B) Current surges after temporary switching off supply
- (C) Self relieving property
- (D) Commutating property at heavy load

