Get App on

Play Store

Civil Engineering Mcqs

Two pipe systems can be said to be equivalent, when the following quantites are same______________?

  • (A)  friction loss and flow
  • (B)  length and diameter
  • (C)  flow and length
  • (D)  friction factor and diameter
  • (E)  velocity and diameter
Submitted By :Ali Uppal


Submitted By :Ali Uppal


The stone suitable for rubble masonry should be____________?

  • (A)  hard
  • (B)  tough
  • (C)  heavy
  • (D)  light
Submitted By :Ali Uppal


Quartitze is a_____________?

  • (A)  silicious rock
  • (B)  argillaceous rock
  • (C)  calcareous rock
  • (D)  aqueous rock
Submitted By :Ali Uppal


Which of the following sedimentary rocks changes into quartzite by metamorphic action ?

  • (A)  sand stone
  • (B)  lime stone
  • (C)  shale
  • (D)  gypsum
Submitted By :Ali Uppal


While designing a project by an engineer, ______________should be taken into account to protect cultural heritage?

  • (A)  All possible alternates
  • (B)  No protection
  • (C)  Minimum protection
  • (D)  No care
Submitted By :Ali Uppal


How many commandments are given in PEC Code of Ethics?

  • (A)  20
  • (B)  30
  • (C)  10
  • (D)  05
Submitted By :Ali Uppal


As per PEC Code of Conduct a member shall report unethical professional practices of an engineer or a member with substantiating data to____________?

  • (A)  Court of Law
  • (B)  Concerned Department
  • (C)  Pakistan Engineering Council
  • (D)  Law enforcing Agency
Submitted By :Ali Uppal


Engineering ethics refers to_______________?

  • (A)  The rules and standards given by an institution for Engineering practice
  • (B)  The rules and regulation relating to obligations and rights of others
  • (C)  The professional regulation
  • (D)  The rules and standards which govern the conduct of Engineers as professional Engineers
Submitted By :Ali Uppal


What characteristic best describes the cost baseline?

  • (A)  Total budget for the project
  • (B)  Time phased budget for the project
  • (C)  Total budget for the project including the contingency budget
  • (D)  Total budget for the project including the contingency budget and the management reserve
Submitted By :Ali Uppal