- (A) all industries
- (B) all process industries and thermal power plants
- (C) only major industries
- (D) only key industries
- (E) all industries employing more than 100 workers
Exam preparation MCQs with answers
Practice Pakistan's most useful MCQs for competitive exams
Prepare for NTS, PPSC, FPSC and subject-wise tests with fresh multiple choice questions, clear options and quick answer reveal.
Latest MCQs
- (A) detailed calculations
- (B) convenience
- (C) table of random numbers
- (D) past experience
- (E) fixed percentage of daily production
- (A) second
- (B) minute
- (C) hour
- (D) day
- (E) none of the above
- (A) material handling
- (B) proper utilisation of manpower
- (C) production schedule
- (D) efficient working of machine
- (E) all of the above
- (A) batch production
- (B) continuous type of product
- (C) effective utilisation of machines
- (D) all of the above
- (E) none of the above
- (A) an idea of the flow of materials at various stages
- (B) a compact estimate of the handling which must be done between various work sections
- (C) the information for changes required in rearranging material handling equipment
- (D) an approximate estimate of the handling which must be done at a particular station
- (E) solution to handling techniques to achieve most optimum^ results
- (A) overall simplification, safety of integration
- (B) economy in space
- (C) maximum travel time in plant
- (D) to provide conveniently located shops
- (E) to avoid any bottlenecks
- (A) product layout
- (B) functional layout
- (C) automatic material handling equipment
- (D) specialisation of operation
- (E) minimum travel time plan and com¬pact layout
- (A) top level executives have to do excessive work
- (B) structure is rigid
- (C) communication delays occur
- (D) all of the above
- (E) none of the above
- (A) line organisation
- (B) line and staff organisation
- (C) functional organisation
- (D) effective organisation
- (E) none of the above