- (A) where production activities are involved
- (B) in judging the rating of machines
- (C) in improving industrial relations
- (D) in judging the output of a man and improving it
- (E) where men are biggest contributor to success of a project
Exam preparation MCQs with answers
Practice Pakistan's most useful MCQs for competitive exams
Prepare for NTS, PPSC, FPSC and subject-wise tests with fresh multiple choice questions, clear options and quick answer reveal.
Latest MCQs
- (A) overhead crane
- (B) trolley
- (C) belt conveyor
- (D) all of the above
- (E) none of the above
- (A) inspection
- (B) transport
- (C) delay/temporary storage
- (D) permanent storage
- (E) none of the above
- (A) graph paper
- (B) process chart
- (C) planning chart
- (D) stop watch
- (E) analytical mind
- (A) a supercharger
- (B) a centrifugal blower
- (C) a vacuum chamber
- (D) an injection tube
- (E) forced chamber
- (A) line organisation
- (B) line and staff organisation
- (C) functional organisation
- (D) all of the above
- (E) none of the above
- (A) specialisation exists
- (B) machines are arranged according to sequence of operation
- (C) few number of non-standardised units are to be produced
- (D) mass production is envisaged
- (E) bought out items are more
- (A) batch production
- (B) continuous production
- (C) effective utilization of machine
- (D) all of the above
- (E) none of the above
- (A) analysis of process chart
- (B) flow of material
- (C) ordering schedule of job
- (D) controlling inventory costs money
- (E) all of the above
- (A) 0.0001 minute
- (B) 0.0006 minute
- (C) 0.006 minute
- (D) 0.001 minute
- (E) 0.06 minute