- (A) Fully in excavation
- (B) Partly in excavation and partly in embankment
- (C) Fully in embankment
- (D) All the above
Exam preparation MCQs with answers
Practice Pakistan's most useful MCQs for competitive exams
Prepare for NTS, PPSC, FPSC and subject-wise tests with fresh multiple choice questions, clear options and quick answer reveal.
Latest MCQs
- (A) 0.25 kg
- (B) 0.50 kg
- (C) 0.75 kg
- (D) 1.00 kg
- (A) 100 %
- (B) 75 %
- (C) 50 %
- (D) 25 %
- (A) Bib-cocks
- (B) Stop-cocks
- (C) Ball valves
- (D) All the above
- (A) 30 D
- (B) 39 D
- (C) 50 D
- (D) 59 D
- (A) 0.01 cum
- (B) 0.02 cum
- (C) 0.03 cum
- (D) 0.04 cum
- (A) Collapsible gates
- (B) Rolling shutters
- (C) Ventilators and glazing
- (D) All the above
- (A) Honey comb brick work
- (B) Brick flat soling
- (C) Half brick walls or the partition
- (D) All the above
- (A) 1.00 cum
- (B) 2.00 cum
- (C) 3.00 cum
- (D) 4.00 cum
- (A) The total length of centre line of four walls is 20 m
- (B) Length of long wall out-to -out is 6.80 m
- (C) Length of short walls in-to-in is 3.20 m
- (D) All the above