- (A) PERT
- (B) CPM
- (C) CMM
- (D) Both PERT and CPM
Software Engineering Mcqs
- (A) Degree of Rigor
- (B) Adaptation criteria
- (C) Task Set
- (D) Both degree of Rigor and adaptation criteria
- (A) BCWS
- (B) EVA
- (C) BAC
- (D) CBSE
- (A) Size of the project
- (B) Customers Complaints
- (C) Project staff
- (D) Mission criticality
- (A) data distributing system
- (B) data acquisition system
- (C) data collector system
- (D) none of the mentioned
- (A) Movement detector
- (B) Door sensor
- (C) Window sensor
- (D) All of the mentioned
- (A) Asynchronous communication
- (B) Observe and React
- (C) Environmental Control
- (D) Process Pipeline
- (A) object-oriented systems
- (B) architectural design
- (C) SRS
- (D) Both object-oriented systems and Architectural design
- (A) Using large-grain components improves performance but reduces maintainability
- (B) Introducing redundant data improves availability but makes security more difficult
- (C) Localizing safety-related features usually means more communication so degraded performance
- (D) All of the mentioned
- (A) model-view-controller
- (B) architecture pattern
- (C) repository pattern
- (D) none of the mentioned

