Mechanical Engineering Mcqs

An optimum project schedule implies_______________?
  • (A)  optimum utilization of men, machines and materials
  • (B)  lowest possible cost and shortest possible time for project
  • (C)  timely execution of project
  • (D)  to produce best results under given constraints
  • (E)  realistic execution time, minimum cost and maximum profits
Current assets include_______________?
  • (A)  manufacturing plant
  • (B)  manufacturing plant and equipment
  • (C)  inventories
  • (D)  common stock held by the firm
  • (E)  all of the above