- (A) quality
- (B) statistics
- (C) probability
- (D) all of the above
- (E) none of the above
Mechanical Engineering Mcqs
- (A) one time estimate
- (B) two time estimate
- (C) three time estimate
- (D) four time estimate
- (E) nil time estimate
- (A) short run analysis
- (B) long run analysis
- (C) average of above two run analysis
- (D) there is no such criterion
- (E) none of the above
- (A) paid as per efficiency
- (B) ensured of minimum wages
- (C) not paid any bonus till his efficiency
- (D) never a loser
- (E) induced to do more work
- (A) Scanlon Plan
- (B) Rowan Plan
- (C) Bedaux Plan
- (D) Taylor Differential Piece Rate System
- (E) Halsey Premium Plan
- (A) optimum utilization of men, machines and materials
- (B) lowest possible cost and shortest possible time for project
- (C) timely execution of project
- (D) to produce best results under given constraints
- (E) realistic execution time, minimum cost and maximum profits
- (A) by time study
- (B) from previous production records
- (C) from one’s judgement
- (D) all of the above
- (E) none of the above
- (A) reduce labour monotony
- (B) overcome boring and demotivating work
- (C) make people happy
- (D) all of the above
- (E) none of the above
- (A) manufacturing plant
- (B) manufacturing plant and equipment
- (C) inventories
- (D) common stock held by the firm
- (E) all of the above
- (A) credited into reserves of company
- (B) deposited in nationalised bank
- (C) deposited in post office
- (D) deposited in the account of worker with employer or Reserve Bank of India
- (E) deposited in the account of worker with Provident Fund Commissioner

