- (A) inspection
- (B) transport
- (C) delay/temporary storage
- (D) permanent storage
- (E) none of the above
Mechanical Engineering Mcqs
- (A) graph paper
- (B) process chart
- (C) planning chart
- (D) stop watch
- (E) analytical mind
- (A) a supercharger
- (B) a centrifugal blower
- (C) a vacuum chamber
- (D) an injection tube
- (E) forced chamber
- (A) line organisation
- (B) line and staff organisation
- (C) functional organisation
- (D) all of the above
- (E) none of the above
- (A) specialisation exists
- (B) machines are arranged according to sequence of operation
- (C) few number of non-standardised units are to be produced
- (D) mass production is envisaged
- (E) bought out items are more
- (A) batch production
- (B) continuous production
- (C) effective utilization of machine
- (D) all of the above
- (E) none of the above
- (A) analysis of process chart
- (B) flow of material
- (C) ordering schedule of job
- (D) controlling inventory costs money
- (E) all of the above
- (A) 0.0001 minute
- (B) 0.0006 minute
- (C) 0.006 minute
- (D) 0.001 minute
- (E) 0.06 minute
- (A) the appraisal, in terms of time, of the value of work involving human effort
- (B) machine setting time
- (C) time taken by workers to do a job
- (D) method of fixing time for workers
- (E) method of determining the personnel Requirement
- (A) work sampling
- (B) time study
- (C) method study
- (D) work study
- (E) ABC analysis