- (A) Thermal plant
- (B) Diesel plant
- (C) Hydroelectric plant
- (D) All have same
Electrical Engineering Mcqs
- (A) nuclear power plants
- (B) diesel generating plants
- (C) thermal power plants
- (D) steam power stations
- (A) fixed charges
- (B) semi-fixed charges
- (C) running charges
- (D) all of the above
- (A) induction motors
- (B) resistive loads
- (C) synchronous Motors
- (D) all of the above
- (A) maximum demand/average load
- (B) average load x maximum demand
- (C) average load/maximum demand
- (D) none of the above
- (A) operating schedule of generating units
- (B) sizes of generating units
- (C) total installed capacity of the plant
- (D) all of the above
- (A) 532 k cal.
- (B) 735 k cal.
- (C) 746 k cal.
- (D) 860 k cal.
- (A) Carnot cycle
- (B) Rankin cycle
- (C) Brayton cycle
- (D) Dual cycle
- (A) peak load plant
- (B) base load plant
- (C) standby plant
- (D) none of the above
- (A) high
- (B) low
- (C) remain same
- (D) depend on the plan type

