- (A) 50 m
- (B) 100 m
- (C) 150 m
- (D) 250 m
Civil Engineering Mcqs
- (A) 78 m
- (B) 150 m
- (C) 300 m
- (D) 450 m
- (A) 0.1 %
- (B) 0.2%
- (C) 0.3 %
- (D) 0.4%
- (A) 32°C
- (B) 35.5°C
- (C) 48°C
- (D) 25°C
- (A) only clearway
- (B) only stop way ,
- (C) either a clearway or a stopway
- (D) either a clearway or a stopway or both
- (A) 1 aircraft per hour
- (B) 2 aircrafts per hour
- (C) 4 aircrafts per hour
- (D) 16 aircrafts per hour
- (A) a unit force is applied at coordinate j and the displacements are calculated at all coordinates
- (B) a unit displacement is applied at co-ordinate j and the forces are calculated at all coordinates
- (C) a unit force is applied at coordinate j and the forces are calculated at all coordinates
- (D) a unit displacement is applied at co-ordinate j and the displacements are calculated at all co-ordinates
- (A) Zero
- (B) 300
- (C) 3000
- (D) Unrestricted
- (A) 2.5 m
- (B) 5.0 m
- (C) 7.5 m
- (D) 10.0 m
- (A) along the extended centre line of runway end
- (B) about 1 km. ahead of the runway threshold
- (C) at the runway threshold
- (D) about 7 km. ahead of the runway threshold

