- (A) tangent track
- (B) sharp curve
- (C) tunnels
- (D) coastal area
Civil Engineering Mcqs
- (A) 0.168 cm
- (B) -0.168 cm
- (C) 7.432 cm
- (D) 7.768 cm
- (A) cost
- (B) life
- (C) track circuiting
- (D) fastening
- (A) Rails
- (B) FishPlates
- (C) Fish Bolts
- (D) Bearing Plates The quantities required for one kilometer of Broad Gauge track will be
- (A) will be more in the direction of B to A
- (B) will be more in the direction of A to B
- (C) will be maximum at the middle of A and B
- (D) cannot be determined from the given data
- (A) 4
- (B) 8
- (C) 12
- (D) 14
- (A) stop
- (B) proceed
- (C) proceed cautiously
- (D) none of the above
- (A) stop
- (B) proceed
- (C) proceed cautiously
- (D) none of the above
- (A) changing the direction of engine
- (B) transferring wagons to and from parallel tracks without shunting
- (C) separating all the sidings and shunting lines from main lines
- (D) preventing the vehicles from running off the track
- (A) both arms are horizontal
- (B) semaphore arm lowered but warner arm horizontal
- (C) both semaphore and warner arms lowered
- (D) none of the above

